ON-SITE PREFABRICATED INSPECTIONS
As part of a shift towards more modern methods of construction, prefabricated elements and the associated factory witness testing became a critical hold-point and interface in the construction...
As part of a shift towards more modern methods of construction, prefabricated elements and the associated factory witness testing became a critical hold-point and interface in the construction...
To deal with the COVID-19 pandemic, the construction industry needed to come up with new and creative ways to mitigate the negative impacts the virus would have on workers’ health and safety as well...
Positional discrepancies for plumbing installation have a significant knock-on effect when unnoticed, resulting in a halt to continued installations and costly reworks to MEP systems.
Errors made during the installation of mechanical equipment can lead to serious site disruptions. The Atom identified mistakes before critical lifting equipment was removed.
Mistakes during groundworks are usually buried with the underground services. However, as the testing & commissioning phase begins, these same mistakes always find a way back to the surface creating...
For structural concrete, any error outside of construction tolerances requires an engineering redesign and often involves costly and timely remedial works.
The fibre cables are the engines that run the data centres and what makes these projects mission critical. It is therefore crucial that the fibre cable ductwork is built right, the first time.